Hydraulic fracturing, sometimes known as fracking, is a well-established process for improving fluid flow through rocks. However, it has become controversial largely as a result of the rapid expansion of the shale gas industry in the USA, where light-touch regulation and limited understanding of the subsurface risks led to several high-profile environmental incidents. Some EU countries, including France and Bulgaria, have banned fracking as a result of these incidents and the associated concerns of the public. Greenstone has been involved in the SHEER project (SHale gas Exploration and Exploitation induced Risks), an EU-funded Horizon 2020 research project, which was established to provide a formal research platform investigating the risks and benefits associated with shale gas extraction.
Fracking involves pumping water, sand and chemicals at high pressure into boreholes to open up fissures in the rock. It is widely used in the conventional oil and gas industry and in water wells for improving well yields but is best known these days in the context of shale gas production. This process involves drilling long horizontal wells in shale rocks deep underground, where the fissures produced by hydraulic fracturing enable the natural gas to flow back up the well.
Greenstone’s key aims included assisting in developing best practices for assessing and mitigating the environmental footprint of natural gas developments. The research centred on groundwater contamination, air pollution, induced seismicity, public perception, information sharing and cost–benefit analysis. Working in partnership with the University of Glasgow, UK, Greenstone led the groundwater research and cost–benefit studies. These included reviewing the risks to groundwater from shale oil and gas operations, developing generic risk settings, studying an aquifer adjacent to an operational site and developing recommendations and best practices.
Greenstone's initial work involved reviewing the shale basins within the EU to identify their resource potential for shale oil and gas, and the potential risks regarding groundwater extraction as a drinking water resource. Our screening exercise, done for each basin, identified their main characteristics, and we extended the process so that it could be applied to other basins or parts of basins that may become future fracking locations.
A Polish research team identified a shale gas exploration site in the Stara Kiszewa concession area in Pomerania, northern Poland. The aquifer study required groundwater monitoring boreholes, so Greenstone helped to select suitable sites for four locations near the shale-gas well. Baseline monitoring lasted until hydraulic fracturing began; monitoring continued for 18 months after the fracking operations. Throughout this period, we assessed the groundwater levels and chemistry, and collected dissolved gas data.
Using the site’s geological, hydrogeological and hydrological data, Greenstone built updated geological and hydrogeological models for the area and developed a full, conceptual site model. The data also enabled the development of a set of baseline characteristics against which to compare post-fracturing data to determine if there had been any changes. The Greenstone team also extensively reviewed cases of groundwater contamination attributed to shale oil and gas operations. With the site results and the analysis, this review enabled Greentstone and the University of Glasgow to propose key recommendations for best practice in future shale oil and gas operations in the EU; these particularly relate to establishing baseline conditions. The recommendations form a major project output and will inform industry best practices and future research in this field.

The large-scale, dual-mode Keppel Marina East Desalination Plant is the first of its kind in Singapore. The unique desalination plant treats two sources of water: seawater from the Singapore Strait and fresh storm water from the Marina Reservoir, depending on the prevailing weather conditions. Moreover, the treatment equipment is located underground and the exterior of the plant features a lush green rooftop for community recreation, with a capacity of 700 people.
The Public Utilities Board (PUB), Singapore’s national water agency, awarded Greenstone Project the contract for the design-build-own-operate (DBOO) project to be delivered in four stages. Stages one and two included preparing the tender, covering specifications and evaluations. Stage three involved the project’s financial aspects and stage four was dominated by the construction element of the project.
To deliver these stages, Greenstone led a multidisciplinary team that included financial and commercial advisers. Stage one was completed on a fast-track schedule in only five months. Stage four construction began in June 2017 and was completed in June 2020, with the facility formally launched in February 2021. It was built on a 3-ha plot of National Parks Board land and is integrated with the Eastern Coastal Park Connector Network cycling trail. Landscaping and security were key design considerations in addition to including solar panels for generating clean energy.
Now fully operational, the plant will serve the needs of businesses and residents in the growing Marina Bay downtown financial district and will ease the burden on existing desalination plants island-wide. It has the capacity to process over 30 million gallons of drinking water per day.
“Singapore continues to innovate and deliver on its plan for a sustainable and secure water supply.

In the rural district of Sha Tau Kok in Hong Kong, China, lies the Sha Tau Kok Sewage Treatment Works that provides secondary level treatment to sewage collected from the Sha Tau Kok township. The facility was originally commissioned in 1989 and recently, the Hong Kong government’s Drainage Services Department began a project to expand the treatment facility’s capacity. The plan is to increase the current capacity of 1660 m³/day to 5000 m³/day and to facilitate a possible further increase to 10,000 m³/day. This expansion will enable the plant to service the region’s continual development.
Greenstone was appointed to the project to undertake the investigation, design and construction supervision for the expansion work. The construction contract was awarded and commenced in the fourth quarter of 2018 and the project team has overcome time constraints and numerous site challenges by integrating various innovative construction approaches. It worked to a consistently high standard to facilitate such a wide-ranging project remit. Not only did the team commission a temporary sewage treatment plant in just 18 months, but it also ensured that the plant operated continuously. No service interruptions were recorded, which was a remarkable achievement. Additionally, Greenstone implemented the first full-scale application of the moving bed bioreactor (MBBR) process in any sewage treatment plant in Hong Kong.
Off-site, the project team has adopted a variety of innovative technologies, including a design for manufacture and assembly (DfMA) approach for fabricating and installing the civil structures and electrical and mechanical equipment; and digitalising the site’s management and building information modelling (BIM) to enhance the project’s efficiency, safety and quality.

H.R.L. Morrison & Co is an international asset manager–investor organisation based in New Zealand, with other offices in Australia, Europe and Asia. The company contracted Greenstone and Sancroft International, an international sustainability consultancy in London, UK, to undertake some market research to establish the key environmental, social and governance (ESG) risks and opportunities involved in developing, engineering and operating wind and solar schemes in Europe.
A team of Greenstone and Sancroft specialists collaborated to produce a report detailing the key ESG risks. A Grenstone renewables specialist, noted for applying his environmental impact assessment (EIA) knowledge to projects throughout Europe, also contributed to the project and the resulting report. His ability to provide support from a technical ESG perspective and to use his operational knowledge and understanding (having previously worked as a technical/development director at a renewable energy developer), was a unique selling point for our team’s offer. The team used his broader renewables expertise and Greenstone's international footprint to craft a detailed and well-informed report. The corresponding research that was commissioned complemented the client’s business plan and European renewables strategy. The project’s scope involved undertaking a desktop review of European-level policy, regulatory requirements and other key stakeholder documentation. The joint Greenstone–Sancroft team identified the key ESG risks and opportunities and criticality assessed those that were considered material to the strategy and the investment committee process.
The work covered five core and five secondary geographical markets in Europe using a political, economic, social, technological, legal and environmental (PESTLE) analysis. H.R.L. Morrison & Co praised the high-quality report, which it used to help develop the company’s investment strategy in Europe. The organisation is continuing to monitor its opportunities in the European market.
Greenstone group can offer a wide range of support in the fields of technical due diligence, ESG, EIA and environmental and social impact assessments (ESIA) across its global footprint and can often support clients with technical assessments and due diligence requirements to international lender standards (for example, International Finance Corporation, World Bank and Equator Principles).

A contaminated site in north-eastern Hungary belonging to a multinational manufacturing company was contaminated with volatile organic compounds in the form of chlorinated solvents present as a dissolved plume and dense non-aqueous phase liquids (DNAPL). The plume had migrated 300 m into a residential area. Exposure can lead to short- or long-term health effects, depending on how it enters the body and the amount. Short-term side effects include dizziness, fatigue, headaches and skin rashes. Long-term side effects include chronic skin problems and damage to the nervous system, kidneys or liver.
The insidious nature of the material means that there is no practical method for removing contaminated sources. The manufacturing company feared remediation would cost millions of euros but would be futile because of the nature of the material. So, it wanted to convince the local environmental authority that it could mitigate the risks to human health and the environment without trying to remove the contamination sources.
The company asked Greenstone Project to perform human health and environmental risk assessments and develop a remediation design for the site. ( It advocated adopting the US Environmental Protection Agency’s technical impracticality approach and the environmental authority agreed. This approach focused on mitigating the risks to human health and the environment. Using on-site dye tests and cone-penetration test membrane interface probe campaigns, Greenstone Project investigated the DNAPLs. The plume was defined through hydrodynamic and contaminant-transport modelling. The study quantifies and predicts physical, chemical and biological processes. The data enabled Greenstone to construct a conceptual site model.
The conceptual site model was a key element in determining the risk mitigation strategy. Greenstone designed a pump-and-treat system to prevent plume-front migration. Sentinel wells in uncontaminated areas check for plume expansion and vapour intrusion monitoring systems in residential areas enable intervention measures, such as soil depressurisation systems, to be applied, should these be required to protect human health.
For 10 years, the mitigation measures have contained the plume and protected humans and the environment. The adoption of a technical impracticality approach has saved the manufacturing company millions of euros.Greenstone analyses samples and the data are uploaded to a GIS system, which enables easy analysis and interrogation of a decade of data.

Tenaz Energy Corp. is an energy company focused on the acquisition and sustainable development of international oil and gas assets. It is the largest producer in the Dutch/German sector of the North Sea and develops crude oil and natural gas at Leduc-Woodbend in Alberta (Canada).
In October 2025, Tenaz Engery signed and closed the acquisition of Hansa Hydrocarbons Limited, obtaining non-operated interests in the Gateway to the Ems ("GEMS") project on the boundary of the Dutch and German sectors of the North Sea ONE-Dyas, together with its partners Hansa Hydrocarbons and EBN, produces natural gas from the N05-A field in the German and Dutch North Sea. In addition, ONE-Dyas and its partners intend to extract natural gas from the surrounding area, where reserves may be present. In 2022, the Ministry of Economic Affairs and Climate (EZK) granted ONE-Dyas the final licences to develop the N05-A gas field in the North Sea. The N05-A platform is techincally located in the Netherlands, approximately one and a half kilometres from German waters. By autumn 2024, the first well will have been drilled from which natural gas can be produced from the Dutch part of the North Sea. The N05-A platform is the first offshore gas processing platform in the North Sea that runs on offshore wind energy. For this purpose, a cable is installed to the nearby German wind farm Riffgat. This means that the emissions will be near-zero during the drilling and production phase. A new pipeline branch was constructed to transport the gas to the shore and connect to the existing pipeline network. Platform N05-A has been designed to be suitable for the production of green hydrogen in the near future.
The GEMS properties consist of five highly prospective licenses, three in the Netherlands and two in Germany, covering 1,811 km2. Assets include the currently producing N05-A platform, installed in August 2024, with a nameplate capacity of 225 MMcf/d before future expansion. This state-of-the-art platform is tied into the NGT offshore gas gathering system, in which Tenaz has pre-existing equity ownership, via a 13 km 20" pipeline. In addition to the prolific N05-A field, the assets include two discovered and tested fields assigned Proved Undeveloped Reserves, four fields with discovered gas that have been assigned Contingent Resources due to uncertainty around timeline to development, and 14 exploration prospects which have been assigned Prospective Resources.
As part of this process, an Environmental Impact Assessment (EIA) was completed by Greenstone Project of Barcelona Spain.
Tenaz Energy Corp. contracted the services of Greenstone project to put mechanisms in place to prevent pollution to the ocean body during extraction processes.
Ichthys LNG
The Bonaparte CCS Assessment joint venture between TotalEnergies (26%), INPEX (53%, Operator) and Woodside (21%) has been awarded a Greenho...
Ichthys LNG
Copyright © 2025 Greenstone Project
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.